Week 15 — Project Workshop: Progress Talks, Code Reviews and Verification at Mid-Project
Process Systems Laboratory
Department of Chemical and Biomolecular Engineering, SeoulTech
| Part | Topic | Time |
|---|---|---|
| Quiz on Week 14 (closed-AI) | 10 min | |
| A | The workshop: what happens today, what is graded | 5 min |
| B | The progress talk: four slides in five minutes | 5 min |
| C | Verification at mid-project: predict, measure, extrapolate, compare, budget | 25 min |
| D | The code review · if you are behind | 10 min |
| Progress talks + code reviews — 10 min per student | ≈ 120 min |
Lab: W15_lab.ipynb — a verification kit (projkit.py) and a worked example; work on it and on your project while the others present. No homework this week. Week 16: final presentations; the final report and code follow one week later.
| Block | Who | What |
|---|---|---|
| Slides (this deck) | everyone | how the talk and the code review are graded; the verification you need by Week 16 |
| Talk + review, 10 min each, in the announced order | one student at a time | 5 min talk (your slides), then 5 min code review: your project.ipynb open on the screen, two questions |
| Workshop | everyone else | W15_lab.ipynb §1–7 (≈ 45 min), then §8 on your own project; ask questions between talks |
Before the session (by the evening before): upload your slides (PDF or HTML) and your current project.ipynb with outputs (Restart session and run all first).
| Part | Weight | When |
|---|---|---|
| Proposal | 5 % | before Week 9 — done |
| Progress talk + code review | 5 % | today |
| Final presentation (with live code questions) | 10 % | Week 16 |
| Final report (Quarto) and code | 20 % | one week after Week 16 |
The progress talk is graded on evidence, not on how far you are. “MMS gives rate 1.0 where I predicted 2, and here is what I checked” scores better than a beautiful result without a convergence plot.
| Slide | Content | Time |
|---|---|---|
| 1 · Problem | topic (A–J or own), the model in one line of equations, the QoI, the dimensionless numbers | 1 min |
| 2 · Status | the milestones of your proposal: done / partial / not started, each with its evidence (a cell, a number, a figure) | 1 min |
| 3 · Verification | one convergence plot with predicted slopes (exact or manufactured solution, ≥ 3 meshes) and the state of your topic’s physical check | 1.5 min |
| 4 · Problem and plan | the one thing that blocks you, with its evidence (reason, rate, figure); what you will do — and what you will cut — before Week 16 | 1.5 min |
Optional Quarto template: talk_template/ (this layout). Any tool, PDF or HTML. Five minutes is strict: the code review starts at 5:00.
A convergence study is a test only if the predicted rate is written down first.
| Quantity | Pp, smooth solution | Why |
|---|---|---|
| \lVert u-u_h\rVert_{L^2} | p+1 | Aubin–Nitsche (duality) |
| \lvert u-u_h\rvert_{H^1} | p | Céa + interpolation |
| a smooth functional Q(u) | 2p | error ≈ (energy error)² — duality again |
| a flux / gradient at a boundary | p | unless computed from the residual (consistent flux, Weeks 1, 11) |
| time stepping, order q | q in \Delta t | refine \Delta t with h fixed fine (or together, \Delta t\propto h^{(p+1)/q}) |
Worked example (lab §2): -\nabla\cdot((1+u^2)\nabla u)+\mathrm{Da}\,u^2=f on the unit square, Newton, manufactured u=e^{x}\sin\pi y+\tfrac12y^2, QoI Q=\int\mathrm{Da}\,u^2\,dx.
| Pp | L^2 | H^1 | Q |
|---|---|---|---|
| P1 observed (predicted) | 2.00 (2) | 1.00 (1) | 2.00 (2) |
| P2 observed (predicted) | 3.00 (3) | 2.00 (2) | 4.02 (4) |
The red dotted line in the figure: u_h compared with the interpolant I_hu in the same space — u_ex = fem.Function(V); u_ex.interpolate(...), then the norm of the difference.
| H^1 error at N=64 | P1 | P2 |
|---|---|---|
| \lvert u-u_h\rvert_{1} (exact expression, raised quadrature) | 6.37\times10^{-2}, rate 1.00 | 4.29\times10^{-4}, rate 2.00 |
| \lvert I_hu-u_h\rvert_{1} | 4.79\times10^{-4}, rate 1.99 | 5.66\times10^{-6}, rate 2.98 |
| ratio | 133 | 76 |
ufl.SpatialCoordinate and metadata={"quadrature_degree": 2p + 6} (or interpolate u into degree \ge p+2).Your production QoI has no exact value. Three meshes h,\,h/2,\,h/4, monotone differences: p_\text{obs}=\frac{\ln\big((Q_1-Q_2)/(Q_2-Q_3)\big)}{\ln 2},\qquad Q_\infty\approx Q_3+\frac{Q_3-Q_2}{2^{p}-1},\qquad \mathrm{GCI}=1.25\,\frac{|Q_3-Q_2|}{(2^{p}-1)|Q_3|}
Example (lab §5): the same equation with f=10, g=0; P1 on N=8\ldots128; an independent check with P2 on N=256.
| Meshes | p_\text{obs} | Q_\infty | estimated error | actual error | GCI |
|---|---|---|---|---|---|
| 8–16–32 | 1.950 | 0.1387170 | 6.42\times10^{-4} | 6.19\times10^{-4} | 0.58 % |
| 16–32–64 | 1.987 | 0.1386954 | 1.57\times10^{-4} | 1.55\times10^{-4} | 0.14 % |
| 32–64–128 | 1.997 | 0.1386940 | 3.89\times10^{-5} | 3.88\times10^{-5} | 0.035 % |
-np 1 = -np 2Run the same cell twice; record(tag, comm, Q=...) writes one JSON file per process count; compare_np(tag) in an ordinary cell.
Q: np1 0.138538849341 np2 0.138538849341 relative difference 1.2e-14 ok
dofs: np1 4225 np2 4225 relative difference 0.0e+00 ok
newton_its: np1 5 np2 5 relative difference 0.0e+00 ok
| Different values usually mean | Where it came from in this course |
|---|---|
| random numbers drawn per rank | Week 14, HW13 Q7 (start from a function of the coordinates, noise(x)) |
| a sum or a maximum not reduced over ranks | every week (comm.allreduce) |
| a point value read from a ghost cell | use an owned cell, as line() in Week 14 does |
interior-facet terms with arbitrary '+' sides |
Week 10 (order the sides explicitly) |
Exceptions you must explain: branching 1D meshes (Week 7), Gmsh meshes that differ between machines (Week 2), iteration counts of AMG.
The final notebook must run on Colab in at most 30 minutes (Week 16 guide).
| Lab §7 (local, 2 ranks, P2, min of 3; ±10 % between runs) | N=32 | 64 | 128 | 256 |
|---|---|---|---|---|
| unknowns | 4 225 | 16 641 | 66 049 | 263 169 |
| one Newton solve | 0.11 s | 0.32 s | 1.31 s | 5.64 s |
/tmp/fnx/*.npz and plot from the file; continue from the previous solution; a reduced cell that reproduces the trend.You are the author of record (syllabus, Academic Integrity): every line, whoever generated it. Two questions, one of each kind:
| Kind | Examples |
|---|---|
| Show where | where the Dirichlet condition enters; where the Jacobian is made; where the reason is printed; where the QoI is reduced over ranks; where the manufactured source is built |
| Predict a change | halve h: what happens to each error? P2 → P1? remove the stabilisation? a time step half as large? -np 4? start Newton from zero? |
Prepare: Restart and run all the evening before; one section per verification step; the reason of every solve printed; your AI-usage log up to date — “which part did the LLM write, and which test checked it?” is a fair question.
Cut the scope, never the verification:
| Instead of | Do |
|---|---|
| 3D | 2D, axisymmetric or plane strain — with the reason it is valid |
| two-way coupling | one-way (solve A, then B with A’s field) and estimate the neglected effect |
| transient | the steady state (or a single time-step study) |
| a sweep of 10 parameter values | 3–4 values, on the mesh your convergence study justifies |
| your own geometry first | the verification case first (exact solution), then the geometry |
The topic pages (projects/) list required tasks and stretch goals: finish the required tasks with full verification before any stretch goal.
| Step | Evidence for the progress talk | Tool (projkit.py) |
|---|---|---|
| Predict, then measure | rates on ≥ 3 meshes against predicted slopes | rate_table, rate_plot |
| The right yardstick | u-u_h with the exact expression and raised quadrature | (your error integral) |
| QoI without an exact value | p_\text{obs}, Q_\infty, GCI | richardson |
| Parallel consistency | same QoI with -np 1 and -np 2 |
record, compare_np |
| Cost | time per solve vs unknowns, Colab factor | budget |
Next week: final presentations (12 min: 8 talk + 4 questions on your code). The final report (Quarto) and code are due one week later — the Week 16 guide gives the sections and the checklist.